Site Overlay

FUNDER ROI

PRIVATE & CONFIDENTIAL

THERON ENERGY FUNDER ROI

PITCHDECK

Non-Dilutive Infrastructure & Pilot Funding Brief

THERON ENERGY LLC

Autonomous Solid-State Power Infrastructure for Commercial Fleets

$35,000 Direct-to-Vendor Infrastructure & Certification Facility

Funding the immediate 6-unit precision CNC build and ISO/IEC 17025 lab certification of the THERON TURRBARY® GROUP 31 to initiate winter fleet trials with national truck leasing leaders (Penske and Ryder).

Royal Palm Beach & Jupiter, Florida  |  USPTO Patent Application No. 63/641,548  |  100% USA Engineered & Manufactured
01 — Operational Bottleneck

Heavy-Duty Fleets Lose Billions Annually to Chemical Battery Failure

Cold-Weather Cranking Failure

Lead-acid and AGM batteries lose up to 50% of cranking capacity in sub-zero winter operations, causing roadside jump-starts and missed delivery windows.

Chronic Sulfation & Replacement Cycles

Class 8 tractors burn through 3–4 Group 31 batteries every 18–24 months under continuous parasitic and cab hotel loads.

Lithium Thermal & Safety Liabilities

High-cost lithium replacements introduce thermal runaway hazards, complex BMS failure points, and hazardous-material shipping/operating restrictions.

Zero Drop-In Permanence

Fleets lack a maintenance-free, non-chemical power source that fits existing BCI battery trays without vehicle rewiring.

02 — Core Technology

The Infrastructure Solution — THERON TURRBARY®

Replaces degrading electrochemical batteries with continuous, autonomous solid-state permanent magnetic power generation inside standard BCI drop-in enclosures.

Continuous Regulated Output

Delivers steady 12.8V – 14.2V DC power with zero external fuel requirement and zero electrochemical capacity fade.

Zero Chemical or Fire Hazard

Contains no sulfuric acid, produces zero explosive hydrogen off-gassing, and eliminates lithium thermal runaway risk.

50-Year Operational Envelope

Engineered for up to 438,300 hours (50 years) of continuous operation with zero scheduled maintenance.

True BCI Drop-In Compatibility

Direct mechanical and electrical replacement for standard BCI Group 31, Group 65, and Group 24 commercial fleet installations.

03 — Mechanical & Electrical Engineering

Proprietary Architecture — Solid Copper Bus Design

Solid Machined Copper Shafts

Unlike conventional batteries relying on soft cast-lead posts or high-resistance stainless hardware, every TURRBARY® unit features solid machined copper shafts passing directly into the internal generator core.

Zero Terminal Voltage Drop

Continuous direct-bus conductivity maximizes current transfer during high-amperage Class 8 diesel cold cranking in sub-zero conditions.

Mechanical Shock Immunity

Eliminates terminal lug deformation and internal plate fracture across multi-million-mile commercial frame-rail shock and vibration.

04 — Commercial Readiness & Unit Economics

Three Standardized BCI Models Priced for High-Margin Fleet Rollout

Model Target Commercial Application Retail MSRP Tier-1 Fleet Pricing
THERON TURRBARY® GROUP 31
(Flagship)
Class 8 semi-trucks, refrigerated transport, heavy equipment, defense logistics $3,950 – $4,200 $3,550 / unit
THERON TURRBARY® GROUP 24 Light commercial vans, marine starting, emergency & RV banks $2,950 – $3,200 $2,650 / unit
THERON TURRBARY® GROUP 65 Heavy-duty utility pickups (F-150 to F-550), ambulances, municipal fleets $2,550 $2,295 / unit
Immediate Commercial Payback Leverage: Live commercial registration and ordering portal active at therongenerators.com. Selling just 10 Group 31 units at Tier-1 fleet pricing generates $35,500—recovering 100% of the requested infrastructure facility.
05 — Defensibility & Technical Pedigree

Protected IP Led by Veteran Power & Systems Engineering

Intellectual Property & USA Supply Chain

USPTO Patent Application No. 63/641,548 (Patent Pending) covering core autonomous permanent magnetic generator architecture. Engineered in Royal Palm Beach, FL; precision-machined and assembled F.O.B. Jupiter / Jensen Beach, FL.

Cornelius B. Theron — Founder & Principal Engineer

Credentials: MSEE, MMSCE, MSSE, MSAE, MSGWS, MSAE.RF, MSCE; IEEE Life Member. Decades of hands-on leadership in high-reliability electrical power generation, aerospace/defense systems engineering, RF/electromagnetics, and critical infrastructure.

06 — Pilot Deployment Strategy

Winter Fleet Rollout & 6-Unit Allocation Plan

Units 1 & 2: Accredited Lab Certification

Delivered immediately upon CNC completion to Blue Whale Energy & Innovation (BWE&I) for independent ISO/IEC 17025 cold-cranking, thermal-chamber, vibration, and safety qualification.

Units 3 & 4: Penske Winter Field Trial

Deployed into Class 8 tractor operation during peak winter months to validate sub-zero starting and cab hotel-load performance prior to fleet procurement.

Units 5 & 6: Ryder Winter Field Trial

Parallel commercial fleet validation measuring alternator/regulator compatibility, parasitic recovery, and maintenance elimination under live route conditions.

07 — Capital Allocation

Exact Use of Funds — $35,000 Direct-to-Vendor Budget

100% Capital Efficiency: Zero founder overhead and zero unrestricted cash. Every dollar is disbursed directly against verified third-party vendor invoices.

Allocation Category Vendor Partner Deliverable & Verification Milestone Amount
1. Precision CNC Machining MP Manufacturing & Design
Jensen Beach, FL (45-yr ISO-grade shop)
CNC milling & lathe production of 6 Group 31 enclosures & solid machined copper shafts with dimensional QC inspection $19,000
2. ISO/IEC 17025 Lab Certification Blue Whale Energy & Innovation (BWE&I)
Greenfield, IN (Accredited Lab)
Independent BCI / SAE J537 thermal-chamber cold cranking, vibration, and safety certification report on Units 1 & 2 $16,000
TOTAL INFRASTRUCTURE FACILITY Direct-to-Vendor Disbursement 6 Certified / Field-Ready Group 31 Units $35,000
08 — Underwriting & Risk Mitigation

Funder Protection & Non-Dilutive Repayment Structure

Direct-to-Vendor Payment Control

Funders disburse directly to MP Manufacturing & Design and BWE&I against written quotes and completion invoices—zero commingling with general operating overhead.

Hard Hardware & Inventory Backing

Immediately produces 6 precision-machined Group 31 units carrying $21,300 – $25,200 in direct commercial hardware value.

Clear Commercial Repayment Waterfall

For revenue-based or project funders, principal plus an agreed fixed funder return is repaid directly from the first 10–12 commercial Group 31 unit sales (projected within 90–120 days of BWE&I certification).

Grant & Cost-Share Alignment

Structured for full compliance with state manufacturing vouchers (FloridaMakes MEP), clean-transport fleet pilot cost-shares, and commercialization matching grants.

09 — 30-Day Execution Sprint

Ready to Cut Metal Upon Fund Release

  • Days 1–3: Fund commitment executed; raw billet aluminum and solid copper bar stock ordered at MP Manufacturing & Design.
  • Days 4–14: CNC machining and dimensional QC inspection completed on Units 1–6; Units 1 & 2 shipped to BWE&I.
  • Days 15–25: BWE&I executes ISO/IEC 17025 thermal, cold-cranking, and vibration qualification; official test report issued.
  • Days 26–30: Units 3–6 deployed into Penske and Ryder winter fleet trials; commercial fleet order book opens for fulfillment.
Cornelius B. Theron
Founder & CEO — Theron Energy LLC | Royal Palm Beach, FL
Phone: (561) 853-6892  |  Email: Cornelius@TheronEnergy.com
Commercial Product Portal: therongenerators.com

PLEASE SIGN OUR MNDA NOW:

MNDA